How Long Does it Take to Replace a Roof? A 2021 Process Breakdown

0
100

Roof repairs need to happen every now and then for various reasons. For example, a roof may just have too much wear and tear over the years. Or, a shoddy repair job from not long ago has finally caught up, and a better repair job may be needed to remedy the mistakes.

Whatever the reason, it’s safe to say that at some point in time, you’ll need to have some sort of repairs done on your roof.

But, what about a full-on roof replacement? At what point will you need one of those? And, just how long does a roof replacement project take from start to finish?

Let’s break it down.

When Would You Need a Roof Replacement?

There are plenty of reasons why a roof replacement may be needed. But, they can all be boiled down to the integrity and functionality of your roof is compromised. Here are several examples of what this might look like:

Your Roof is Just Old

If you have a roof that is in the 25-50-year-old range, then it’s smart to have a roofing contractor take a look to see if your roof needs to be replaced. The age range is large because your roof’s expected life span will vary depending on where you live and the materials used.

Shingles That Are Curling or Missing

If there is excessive curling or you have more than a few missing shingles, then a roofing replacement may be needed as opposed to a minor repair. Again, having a professional roofing crew take a look is the best way to figure out the best course of action.

Damaged Flashing

If you notice that you have damaged flashing or leaks, that is a telltale sign that your roof may need to be replaced. A more thorough inspection from a professional roofer will help you decide whether a flashing repair or a full-on roof replacement is needed.

Discolored Walls or Ceilings

Notice water stains and discoloration in your walls or ceilings? That’s almost a guarantee that there is a major problem with your roof, and you should contact a contractor ASAP.

So, How Long Does a Roof Replacement Take?

While the process of replacing a roof is extensive and there is much to be done, most quality, professional roofs can complete a typical replacement in 1-4 days. Depending on the roofing materials used, the time estimate will vary.

Here are some common types of roofing materials and how long they typically take to be installed:

  • Wood shakes: 3 – 4 days
  • Synthetic Slate: 3 – 5
  • Flat roof: 2 – 3
  • Concrete Tile: 8 – 9
  • Steel sheets: 3 – 4
  • Asphalt shingles: 1 – 2
  • Natural Slate: 6 – 7

The Roof Replacement Process

Different contractors will have different processes in place, but they will all follow this general outline:

Initial Meeting

The contractor will come to your home and discuss the best course of action for restoring your roof. They’ll inspect different areas of your roof to determine whether or not a replacement is necessary. They’ll also collect measurements too.

Design + Material Meeting

Next, you’ll have a discussion with the roofer about the design of your roof and the types of material.

Contract Draft

Based on the info in the first couple of meetings, the contractor will draft a contract that will outline the details and scope of the project. You will then get the chance to look it over and make any changes as you see fit.

Signing Contract

Once the contract outlines your desired project, you’ll sign it.

Build Begins

Soon after, the build will begin.